电池储能系统
(BESS)和微电网

图像
微型电网

概述

西班牙&E has been rapidly expanding its battery energy storage and microgrid portfolio. We have around 21 BESS and microgrid sites with 335 megawatts (MW) of utility-owned energy storage and another 49+ MW in development. 

通常, these battery systems and microgrids are installed on 西班牙&E-owned property; they are adjacent to our existing substation facilities or in critical locations where grid reliability and resiliency is needed most.

微型电网 are small-scale electric grids that can operate independent of or parallel to the larger regional grid and can keep critical community facilities powered during outages. Battery storage is an important part of every microgrid.

Battery storage works by absorbing electricity when it’s abundant on the power grid and sending excess power back to the grid when it’s most needed, such as during the evening after the sun sets and solar energy fades away.

电池存储

Escondido Battery Energy Storage System Project

项目的好处

  • Helps advance our state's and region’s renewable energy goals.
  • Energy storage projects support grid reliability and the integration of more clean energy into the electric grid.
  • Enables the California Independent System Operator (CAISO) to dispatch energy from our batteries at any time to help balance supply and demand on the statewide grid.
  • Extends the availability of renewable energy into peak demand hours to help reduce impacts of power outages, 公共安全停电 (PSPS) and other emergency or unplanned service interruptions.

关于项目

210.01 KB
PDF
电池储能系统 (BESS)和微电网 - Fact Sheet
电池储能系统 (BESS)和微电网 - Fact Sheet
251.08 KB
PDF
西班牙&E Energy Storage and 微型电网 Map
西班牙&E Energy Storage and 微型电网 Map
187.08 KB
PDF
Cameron Corners Microgrid – Fact Sheet
Cameron Corners Microgrid – Fact Sheet

期待什么

Microgrid and battery projects are complicated systems comprised of batteries, inverters or power conversion systems (PCS), 变形金刚, 网络安全通信, 计量, 切换, energy and battery management systems, microgrid controllers (if applicable) and auxiliary equipment. 通常, batteries are installed in custom-built, 在地面上的附件, with a fire suppression and warning system to maximize safety.

 西班牙&E will work to minimize impacts such as noise and dust from construction activities to the extent possible. Construction may take place in phases. Sometimes planned outages may occur due to the nature of this work, and customers will be promptly notified. 

项目进度表及地图

Current BESS Projects in construction:

  • Santee: 10 MW Battery Energy Storage System — estimated end date: Q4 2024

Current Microgrid Projects in construction:

  • Cameron Corners: 500 kW Microgrid — estimated end date: Q4 2024
  • 庇护谷:800千瓦微电网 即将到来的
  • Butterfield Ranch: 800 kW Microgrid —即将到来的

Construction 通知 and Updates

175.48 KB
PDF
Boulevard OIR Microgrid Notification Letter 7-15-22
Boulevard OIR Microgrid Notification Letter 7-15-22
187.43 KB
PDF
Clairemont OIR Microgrid Notification Letter 11-21-22
Clairemont OIR Microgrid Notification Letter 11-21-22
171.97 KB
PDF
Elliott OIR Microgrid Notification Letter 10-31-22
Elliott OIR Microgrid Notification Letter 10-31-22
150.00 KB
PDF
Melrose Substation 电池存储 Project Customer Notification 8-05-22
Melrose Substation 电池存储 Project Customer Notification 8-05-22
177.13 KB
PDF
Paradise OIR Microgrid Notification Letter 7-29-22
Paradise OIR Microgrid Notification Letter 7-29-22
181.85 KB
PDF
Santee BESS Project Notification Letter 1-18-24
Santee BESS Project Notification Letter 1-18-24